JJB Solutions now offers a full range of quality trash receptacles including, Howard, Arkitech, American Series and United Receptacles. Special prices are available to existing customers by calling 800-813- 4869. More news...

U – Channel Post Installation
    1. Always ensure that you check for buried services before digging, if it is law in your county to call miss utility you should do so prior to any installation.
    2. With a post hole digger or spade dig a hole approx 1.5 feet down.
    3. Position the pole in the centre and pour in a concrete solution to cover approx 1 foot at the bottom.
    4. Replace the soil / dirt in the remainder of the hole and compress.
    5. Allow the pole to rest until the concrete is set and the post secured before fitting any stations.

Telescopic Galvanized Square Post Installation

  1. Always ensure that you check for buried services before digging, if it is law in your county to call miss utility you should do so prior to any installation.
  2. With a post hole digger or spade dig a hole approx 1.5 – 2 feet down.
  3. Position the widest square galvanized post into the hole and level it.
  4. Pour in a concrete solution around the outside of the post inside the hole to cover approx 1 foot at the bottom.
  5. Replace the soil / dirt in the remainder of the hole and compress. Allow the post to rest until the concrete is set and the tube secured before fitting the pole or any stations.
  6. Insert the second slimmer post inside the post secured in concrete and bolt into position at desired height, be careful not to trap fingers.
  7. Continue to install the bins etc.

 

JJB Solutions • 1.800.813.4869

Copyright © 2007 JJB Solutions. All Rights Reserved.

Website design and development by Pandenwolf Designs